2011年12月21日星期三

Beats By Dre SaleLandfill EIA no telephone follow public consultation at home

department liberating ,[url=http://www.drdreheadphonesonline.org/]Beats By Dre Sale[/url]

A: Planning in the EIA is only a part of planning approval. In 2009 the State Council promulgated the , make optimization recommendations, measures and requirements.

Q: After planning review, Panyu garbage project to what stage?

A: First, to clarify an issue, this plan is not what we do, we are only responsible for the EIA. We just plan on the environmental impact assessment. Before the five sites,[url=http://www.drdreheadphonesonline.org/]Beats By Dre Sale[/url], including two with slag landfill, are they planning to provide us with the EIA unit, not our's.

Southern News reporter intern Zhou Hui Lin Jinsong Zhao Ling Guangzhou phone has been on the recorded message in status message after any feedback. Yesterday morning, two people came directly to Panyu South Central Division. Relevant staff explained that, given the record of public comment is mainly public opinion, not to answer specific technical questions, so take a message recording mode. But yesterday afternoon, the advice was answered the phone finally started.

yesterday afternoon, the South is a reporter call again,

Q: public participation comments, you do? Public participation change anything?

Incineration plant in Panyu planning of alternative points: big Gang. Of these options point, South Central Division is only responsible for environmental assessment. Southern Reporter photo

A: We do not solve the EIA public issues. Just to gather together the public, combing good, good induction, reflected to the Panyu District Urban Management Bureau and the Planning Unit to coordinate how to get this plan in the end should be. Formal EIA report, there will be a special section on public opinion.

Q: incineration plant in Panyu, five alternative site, the original is how determined?

A: Although fly ash is hazardous waste, but with cement after curing, it is not necessarily a hazardous waste. Provisions for living inside the landfill, is to allow transport of fly ash cement cured into the landfill. As for this in the end be considered hazardous waste, but also to check information, or request for testing.

microblogging Recommended | today's hot microblogging (edit: SN056)

8 15, announcement on August 15 -26 for the second public participation, to seek authorities, experts, and other people of the environmental impact of planning advice and suggestions, the public can use telephone, mail, letters, etc. advice. As of yesterday, including the weekend, including a total of 12-day public participation period has passed five days public notice in the South Central Division Tel, after it has been called into the recorded message, after message without any feedback.

initial planning, the project solidified fly ash base, there is no place. We are concerned that the fly ash during transport, resulting in secondary pollution.

A: This site has not been fully determined. We proposed to build the emergency landfill, they (the plan) provides both Sandy Bay and stone location. Because first of our existing landfill must be in the 12 selected landfills can no longer open up a new site for a landfill. This requirement does not fault the landfill, groundwater to reach a certain depth,[url=http://www.drdreheadphonesonline.org/]Beats By Dre Sale[/url], filtering down is a Rock and Sandy Bay.

alternative locations are determined?

Q: Why you sure you want to build the stone back slag landfill it?

Not only for their comments and suggestions for the record, but also for their patience to answer questions for both sides exchanged nearly two hours.

welcome to comment to comment

Q: emergency landfill, why would you want to build in the river?

A: incineration plant slag, brick in place as originally planned. We propose to the EIA, want to make it broken, take paved road. The slag, under normal circumstances would be to use 100% out, but if not then being consumed? So spare slag landfill to be built. If this slag landfill to be built, but also through a separate project approval procedures.

Southern Reporter after the phone call, answer the call girl is claiming publicity contact She explained that the message recording settings, mainly worried about travel, residents missed out of the office phone. For all phone calls,[url=http://www.drdreheadphonesonline.org/]Beats By Dre Sale[/url], they will be 11 to listen to.

Q: Why are not sent to Panyu incineration plant fly ash hazardous waste disposal center, and to spare landfill it?

in Panyu waste project planning EIA in South Central Division staff and visiting public to communicate

that At this time, who answered the phone then came project planning EIA personnel office. The two main persons involved in the EIA to explain to them that take into account the record of public comment is mainly public opinion, not to answer specific technical questions, so take a message recording mode.

11 o'clock yesterday morning, the Southern reporter to residents, property owners following the Lijiang Garden Find a deputy director, the final confirmation that the phone in another office building room 501.

public participation in EIA planning change anything?

Feng Feng Zhou Panyu, Guangzhou municipal solid waste planning for the second EIA publicity, but the South Central Division has been on public participation in telephone message recording status message after any feedback. Yesterday morning, two residents of Panyu,[url=http://www.drdreheadphonesonline.org/]Beats By Dre Sale[/url], South China, Central Division directly to reflect the situation and participate in project planning and environmental assessment of the staff had a positive exchange.

unreasonable publicity people call her door

fly why not send hazardous waste disposal center?

Related articles:

没有评论:

发表评论